SAP MM Study Notes
Contents · S4525

S4525: Consumption-Based Planning and Forecasting in SAP S/4HANA

MRP procedures, planning levels and material master settings, classic MRP and MRP Live, evaluating results, forecasting, reorder-point and time-phased planning, and source determination in MRP.

Unit 1: Introduction to Consumption-Based Planning

  1. Introducing the Material Requirements Planning (MRP) Process
  2. Outlining MRP Procedures

Unit 2: General Configuration

  1. Defining Planning Levels
  2. Maintaining and Configuring Material Master Data

Unit 3: Planning Run Execution

  1. Describing the Planning Run
  2. Executing a Planning Run Using Classic MRP
  3. Executing a Planning Run Using MRP Live
  4. Converting Planned Orders and Evaluating MRP Lists
  5. Evaluating the Planning Results

Unit 4: Forecast

  1. Explaining Basics of the Forecast
  2. Executing and Postprocessing the Forecast
  3. Performing Forecast-Based Planning
  4. Performing Time-Phased Planning
  5. Performing Automatic Reorder Point Planning

Unit 5: Source Determination

  1. Explaining Source Determination in Material Requirements Planning

T-codes in S4525

BP MD01 MD01N MD02 MD03 MD04 MD05 MD06 MD07 MD11 MD12 MD14 MD15 MD25 MD40 MD41 MD42 MD43 MD45 MD46 MD50 MD51 MDBT MDRE MDW1 MD_MRP_FORCE_CLASSIC ME01 ME11 ME31K ME31L ME38 ME57 ME59N MEQ1 MM01 MM02 MMD1 MMD7 MP30 MP38 MP39 MPBT MPDR OM0K OMD3 OMDA OMDG OMDK OMDQ OMI4 OMI8 OMIG OMIL OMIO OMIZ OMJJ OPPR OPPZ OWD1 PPH_MDAB SA38 WDIS